1.8.0 LWS IDC and Report Release, July 19, 2013
1.7.5 Deployed April 21, 2013
LI Report Content Update:
- Enhancements to Planning and Development Section
- Additional Recommended Resources Added
LSI Composite Functionality
- "All Projects" option in "Select participants from:"
drop-down.
- Bug fix: Participant lists in composites 2 pages or more now format
properly.
1.7.4 Deployed March 17, 2013
LI Report Content Update:
- Enhancements to Planning and Development Section
- Additional Recommended Resources Added
1.7.3 Deployed November 13, 2012
LI Bug Fixes:
- Loner warnings added similar to LSI.
- Now allows Single Breakout of HLM with permission as long as
3 additional raters.
- LI Powerpoint Updated
- LI report now allows breakouts with only 2 groups
- Processing speed and file size enhancements added.
1.7.2 Deployed 11/05/2012
IDA Bug Fixes:
- Fixed Minor Display issue in Chrome where pop up window
frames were not displaying properly
- Fixed Bug that would cause double associations when creating
a project from your own Administrator page.
IDA Enhancement / New Features:
- When keying in a project number, clicking
"enter" now defaults to the "Go" button instead of the
"Search" button.
- The Auto Reminder window now shows a history of scheduled
reminders after they have been processed instead of just
deleting them.
LSI Enhancement / New Features:
- LSI Time 1 vs Time 2 Powerpoints. Please see
email from Jessica regarding this new report option.
1.7.1 Deployed 9/28/2012
IDC: Minor Bug fix - Fixed an issue with the IDC that cause the questions not to scroll back to the top question after hitting "Next".
1.7.0 Deployed 9/22/2012
Below is a summary of the updates and additional functionality released in
IDA. Please refer to the email communication from Jessica Cooke for more
details.
Database Search
Quick Navigation
Sort project by Instrument
Project Details Tab: Remove Dates - Sample/Test project checkbox
Participant List Exports by Company, client, and coordinator
Client Login organize files in folders
Test/Sample login: Increased number of test users - sent
reminders and extensions - language selection - test activity log
Status Reports Updates: "Declined" instead of "Incomplete"
bug fixed - IDC and RSF URL available in status window - Email log
now included. - Status Reports will display "New" rather than
"incomplete" until invitation is sent.
Update tags enhancement: replacement is case insensitive
for communications - fail safe added in case of duplicate tags -
sample tags file is now UTF-8 to facilitate special characters and
non English languages
Increased character limit for Company and Client names to 100
characters.
Project Coordinator email address must now be unique
IDC Updated: Allowance for comments section for new
Instruments - Instructional text above items space is now dynamic
and will adjust as needed for longer text - Other updates to
accommodate new features used in Org-Level surveys
RSF Reminder functionality added
RSF functionality clarification on project details tab ("Based on
your current settings, the active RSF invitation is: XXXX")
RSF Bug fixes: IDC will redirect to RSF if force complete
is on and RSF is incomplete
1.6.5 Deployed 8/25/2012
Minor Bug Fixes to Client Login
1. Improved Zip Functionality. Files are zipped faster allowing for
larger Zip files without errors.
2. Zip File Time out improvement - If too many files are selected for
zipping, the process will time out at 1 minute and present the user with a
friendly message to select fewer files.
3. Fixed minor bug in displaying reports when backup data files exist on
server.
1.6.4 Deployed 7/21/2012
LSI Report Generator Update:
1) Fixed minor bug in PPT files. Self curcumplex was showing N
for raters. (FogBugz case 1308)
2) Added "Researched and Developed by" Statement to all PPT slides
in all reports. Note: these are currently hard coded in English.
We will update these to show up in the selected language in future
updates. (FogBugz case 1313)
1.6.3 Deployed 7/14/2012
LSI Report Generator Update:
1) Improved importing data validation. Only valid values are
now allowed for Assessment, Satisfaction and Summary Perception
items. (Case 1264)
2) Added ability to include Summary Grid in an LSI 2 only report for
LSI 1 and 2 projects where valid LSI 1 data exists.(Case 1220)
3) LSI Composite PowerPoint's updated to include slides that match
the new LSI Composite reports.(Case 779)
MI Report Generator Update:
1) Updated graphic format in PPT files to reduce file size. (Case 1298/1277)
2) Corrected minor bug that would cause breakout columns to disappear when
changing report type.
3) Corrected minor bug that caused an error if there was exactly 1 HLM in a
project that had not started a survey (Case 1290)
4) Added MI Group PowerPoint (Case 785)
1.6.2 Deployed 6/15/2012
MI Report Generator Update:
1) Access to the 2012 Norms added. (Case 1176)
2) Updated MI Composite report generator with ability to
select project from related Company or Client. (case 1200)
3) See announcement from Jessica Cooke for more information.
LSI Report Generator Update (Minor bug fixes discovered from last
weeks updates).
1) Fixed issue causing LSI 2 only project PPT to not run.
(Case 1238)
2) Fixed issue with LSI 1 PPT displaying extra slides
(Case 1237)
3) Fixed LSI PPt Slide formatting issue (Case 1221)
4) added ability to include comparative PPT slide in LSI 2
only if the LSI 1 data exists for comparison (Case 1193)
1.6.1 Deployed 6/09/2012
Client Login Functionality Update:
1) Multiple File Download capability added.
1.6.0 Deployed 6/02/2012
Enhancements
1) New LSI Composite (case 256)
2) Revised LSI Summary Grid (case 419)
3) Enhanced Breakout Group Information in Report Generator (case
287)
4) Enhanced Participant Selection for Composite Reports (case
942)
5) LSI Breakouts available in Individual PPTs (to match LSI PDF
reports) (case 1080)
Bug Fixes
1) LSI PowerPoint comparatives – minimum N enforced (case
764)
2) Allow LSI 2 Only Comparative Profiles in PPT reports (case
1193)
3) No Response fix (NR) (case 1163)
1.5.1 Deployed 4/25/2012
709 - Extension e-mails for LSI, LI and MI have been update to
properly use the extension date that is entered on the Project
Details tab. Instead of the [ProjectDeadlineDate] tag, they now
include the [ProjectExtensionDate] tag.
1.5.0 Deployed 04/24/2012
M/I Report Generator (full report, summary report, and
PowerPoint)
deployed. See announcement email from Jessica for more information.
1.4.4 Deployed 01/09/2012
ZIP Functionality - Zipping reports functionality has been upgraded in all Report Generators. The ZIP files are generated much quicker.
462 - New ZIP functionality allows PDF files with Asian Characters in the name to be zipped for download. Note: Windows ZIP may not support the encoding. If you download a file and cannot see the reports with Asian Characters in the name, please use an alternate un-zipping program. (7-zip) is a free alternative 864 - The new ZIP functionality fixes the issues with the File
Size and Timing out when trying to ZIP LI reports for download.
Note: we still recommend a 10 report limit for LI due to the file
size of the reports.
1.4.3 Deployed 10/08/2011
792 - LSI Importing Data - Fixed an issue where Self data was not showing as invalid after being imported.
793 - Respondent Selection Form (RSF) - Improved Email Validation routine. It is now able to check to ensure the domain entered is a valid email domain.
807 - Report File Names - Improved naming of files when running reports to include report type. This prevents files from being over written when pushed to the Coordinator logins if multiple reports run (ie, LSI 1 only and LSI 2 only).
808 IDC Sliders - Fixed and upgraded the sliders. This has been tested with Mac and Windows (XP, Vista, and 7). Internet Explorer, Firefox, Google Chrome and Safari. This fixes the issue where the numbers would sometimes not appear on the first page. Also, the latest issue where "7" was not selectable when using the slider.
808a - IDC on Mobile Devices - We do NOT officially support mobile devices. However, some of the code has been updated to allow the surveys to be completed on these devices without issues.
1.4.2 Deployed 08/21/2011
779 - PowerPoint's are now available for LSI 1 only and LSI 2 only.
749 - Fixed Reports not showing Delta Symbol in new IBI section.
777 - Fixed Display issue with Client Login.
1.4.1 Deployed 08/06/2011
759 - Auto reminders now show the office name as the "from" like invitations and reminders sent manually from IDA
726 - Client Login Security enhancements. Minimum Password Strength enforced. Limited list of file types clients are allowed to upload.
1.4.0 Deployed 04/30/2011
000 - Administrator From and Reply To Email. In each Administrator screen 2 additional fields have been added. From Email and Reply To email. Any correspondence sent by you will now use these fields as the "From" and "Reply To" email address. You may leave these as the default or customize them. This only works on emails you send. Emails sent from the Respondent Selection Form will still use the default email address.
000 - Default URL tag update in all correspondence to URLf (Full URL) instead of URLa (Auto URL). This was done as more and more companies are stripping the HTML out of Links in
Emails. When this happens on a URLa the user is left with no login credentials. You may still Use the URLa on a project by Project basis.
399 - L/I Report Generator. See announcement email from Jessica for more information.
249 - Respondent Selection Form (formerly referred to as Online Rater Form). See announcement email from Jessica for more information.
333 - Rater Consent. See announcement email from Jessica for more information.
415 - Detailed Status Reports. Project with Breakouts or Rater Consent now have a 2nd "Detailed Status Report" option.
522 - LSI 1 & 2 Report Power Point slides. LSI 1 and 2 Report only now has the ability to generate Power Point slides.
526 - Client Login. See announcement email from Jessica for more information.
578 - Coordinator Association. See announcement email from Jessica for more information.
630 - Test Logins. Test logins now function on Pre-Launch status projects. This will allow you to test your projects prior to making them active.
000 - Auto Reminders will now only be sent to Participants and Respondents that have been invited.
000 - Various new tags available throughout Correspondence.
333 - Edit Email screen New functionality allows global "Find and Replace" for tags in Emails. See announcement email from Jessica for more information.
610 - Survey now records Screen Resolution. This information can be used on further updates to IDA to target the most common displays of our users.
000 - Each office can now customize the default layout of the reports in the Report Generators. Please send an email to idasupport@hsacumen.com if you would like to change the default sections included in the reports.
1.03.02 Deployed 12/29/10
439--LSI 1 & 2 Report/Summary Perceptions update: Summary Perceptions now list
standard deviation in place of range, consistent with the LSI Composite Report.
490--IDA/IDC passwords: Updated to exclude the following ambiguous characters:
upper and lower case letter "o"; upper case letter "I" (i); lower case letter
"l" (L); numeral zero, and numeral one.
502 & 514--LSI 1 & 2 Expanded Circumplex: Primary and Secondary Style selection
error has been corrected.
504--IDC Correspondence Date Formatting: Corrected a numerical ordering error
occurring when dates were represented in some non-US formats.
505--Report Generator/Composite Reports/Report Type Selection Enhancement: The
Included Participants list will be cleared if the report type is changed after
adding participants to the list.
506--IDA: Language drop-down lists are now arranged alphabetically by full
language name.
1.03.01 Deployed 12/12/10
486--LSI 2/New (International) Norms update: Per Rob Cooke, the LSI 2 norms were
recalibrated the with respect to the 75th percentile for Style 7 (Oppositional).
488--LSI IDC: Code was added to help prevent Sys.Webforms errors in the IDC, as
reported on some client networks.
493--LSI Report enhancements: Fixed a text overlay issue that occurred with long
project names or optional text on the cover page (Composite and Individual
Reports). Norm selection is now saved with report layout (Composite and
Individual Reports). Number of participants selected is now shown in Included
Participants window when moved from Available Participants window (Composite
Reports).
500--IDC/E-mail: Fixed an issue where support e-mail tags (inserted into
correspondence) were not displayed correctly under certain conditions.
501--LSI Composite and Individual Report/Summary Perceptions: Improved text
alignment in the Summary Perceptions range descriptions.
1.03.00 Deployed 11/26/10
- LSI 2010 International Norms
- LSI Normed Item by Item
- LSI Breakouts (including custom breakout functionality)
- LSI Composite Reports
- LSI Satisfaction Items with Mean
- LSI Summary Perceptions With Mean
- LSI Summary Grid
1.02.04 Deployed 11/4/10
- L/I IDC w/Boss Authorization feature; see language grid for details.
1.02.03 Deployed 10/19/10
337--Support and Office E-mail Tag: Your office name and support e-mail address
will be automatically populated in the communication pieces and help text on the
IDC site. If you would prefer an alternate company name or e-mail address,
please contact us at: idasupport@hscar.com
Note: These tags may not be included in some cases where LSI help and
correspondence files have been translated into languages other than English. We
are working with our translators to update these files.
418--Duplicate litho codes assigned: Codes now use 3
digits from the Project ID which allows 4 digits each for the Self and Rater
ID. This will provide a unique number up to 9999 Self and 9999 Raters.
1.02.02 Deployed 8/24/10
- IDC Update and Overhaul: Introduces a new look and fixes several issues (see
below).
124--LSI IDC: Fixes a script error that occurs in some cases when completing the
IDC via Internet Explorer 8 with Compatibility View turned off (default
setting).
291--LSI IDC Demographics Item Display Error: Under certain conditions, items
marked as "do not display" were displayed.
295--LSI IDC: Fixed broken copyright link on the Exit page.
302--LSI IDC/Summary Perceptions: Fixed an error that allowed invalid values to
be saved under certain conditions. This came to our attention due to an Apple
Safari user who was not able to see the number scale on the page, and so had
assumed a 10-point scale, thus invalid values were recorded.
347--IDA/Deadline date tags now include regional information for the language of
the invitation and formats the date accordingly. Ex: en-us = 06/30/20101
fi = 30.6.2010
358--IDA/Project Status Reports: Fixed a problem where the inclusion of an
ampersand in a project name would cause an error message in the title section of
the Status Report.
374--IDA/Import Participants: Fixed an issue where
projects with multiple languages import all participants with the default
language.
1.02.01 Deployed 6/1/10
284--IDA/Customize IDC/Rater Relationships: A custom rater
relationship may no longer be deleted once created in IDA and assigned to a
rater via any method.291--LSI IDC: Fixed foreign language Demographics Item display error for display
false items.
295--LSI IDC: Fixed broken copyright link on Exit page.
319--IDA/RG/LSI: Added regional handling of integer values (decimal points vs.
commas) in reports.
324--IDA/Data/Report/Export Data: Select Participants list now allows individual
rater selection.
326--IDA/Auto-Reminder E-mail: Fixed an issue where reminders were being sent to
raters of participants for whom reports had already been processed (status is
"Reported = Yes").
328--IDA/Status Reports: Removed non-functional check boxes on the Participant
List.
339--IDA/Status Reports and Self and Rater Details Reports: Added instructional
text explaining the use of the following features: Close/Reopen IDC Survey, Set
Self Reported/Unreported, and Set Other Reported/Unreported.
340--IDA/RG/LSI/Report Layout: Fixed an issue where the Single Page Legacy and Standard
Expanded option were reversed when selected in combination.
344--IDA/Participants/Send Correspondence/Preview E-mail: The E-mail Preview page
now includes a new drop-down selection feature--Select Language--that allows you
to preview correspondence in any language that has been added to the project via
Manage Languages.
|